Evening attempt to reach Mt. Inasa (26.06.2025)
| Start point | Nagasaki Central Railway Station (5m) |
|---|---|
| Endpoint | Inasajido Park (25m) |
| Characteristic | Walk |
| Duration | 1h 30min |
| Distance | 4.2km |
| Vertical meters | 165m |
| GPS |
|
| Visits of other PBEs | Inasa Bridge (5m) | 26.06.2025 |
|---|
Link til artikkel fra denne turen ligger her: Evening attempt to reach Mt. Inasa



User comments