Evening attempt to reach Mt. Inasa (26.06.2025)
Start point | Nagasaki Central Railway Station (5m) |
---|---|
Endpoint | Inasajido Park (25m) |
Characteristic | Walk |
Duration | 1h 30min |
Distance | 4.2km |
Vertical meters | 165m |
GPS |
![]() ![]() |
Visits of other PBEs | Inasa Bridge (5m) | 26.06.2025 |
---|
Link til artikkel fra denne turen ligger her: Evening attempt to reach Mt. Inasa
User comments