Kilimanjaro - Uhuru Peak (19.02.1998)
| Start point | Machame Gate (1,800m) |
|---|---|
| Endpoint | Marangu Gate (1,880m) |
| Characteristic | Hillwalk |
| Duration | 147h 00min |
| Vertical meters | 5,700m |
| Map |
|
| Ascents | Gilman's point (5,685m) | 19.02.1998 |
|---|---|---|
| Stella point (5,756m) | 19.02.1998 | |
| Uhuru Peak (5,895m) | 19.02.1998 | |
| Visits of other PBEs | Barafu camp (4,640m) | 19.02.1998 |
| Barranco camp (3,970m) | 19.02.1998 | |
| Horombo hut (3,720m) | 19.02.1998 | |
| Karanga camp (4,025m) | 19.02.1998 | |
| Kibo Huts (4,700m) | 19.02.1998 | |
| Machame camp (3,033m) | 19.02.1998 | |
| Machame gate (1,800m) | 19.02.1998 | |
| Mandara huts (2,710m) | 19.02.1998 | |
| Marangu gate (1,880m) | 19.02.1998 | |
| Shira camp 2 (3,850m) | 19.02.1998 |
Link til artikkel fra denne turen ligger her: Kilimanjaro - Uhuru Peak

User comments